Flow controlProject watch

CSSC 712 Institute lists preferred bidders for gas skids at RMB18.93 million

Curated by valve.market · China
Persistent browser storage is unavailable.
IN BRIEF

Sichuan Ally Hydrogen Technology ranks first in a gas-skid procurement for CSSC's 712 Research Institute. The notice does not identify the gas, so the bidder's name does not establish hydrogen service.

Event: 22 Oct 2026Added: 2026.10.23Source language: Chinese
Illustrative industrial pipework; not the gas skids in the 712 Research Institute procurement.
Illustrative industrial pipework; not the gas skids in the 712 Research Institute procurement. Image: Danylo Sorokin / Unsplash
OrganizationsCSSC 712 Research Institute
Location / scopeWuhan (procuring institution)
Announced stagePreferred-bidder notice
01

The story explained

CSSC’s electronic tender platform published the notice on 22 October 2026 under tender ZC26G270653 and CSSC reference CSSC-07-261043-005. The buyer is the Wuhan-based 712 Research Institute. The disclosed scope is one batch of gas skids.

First-ranked Sichuan Ally Hydrogen Technology bid RMB18,929,919 and scored 71.80. Wuhan Pubeite Technology ranked second at RMB18,500,000, followed by Wuhan Green Clean Technology Engineering at RMB18,968,500. All three proposed delivery within eight weeks of contract signing.

This is a candidate-ranking notice, not a final award or signed contract announcement. Gas composition, design pressure, flow and valve or instrument schedules are absent. The page’s displayed opening and closing dates differ from a three-day notice-period statement in the body; interested parties should confirm the objection deadline with the procurement agent.

02
EDITORIAL INTERPRETATION

Why it matters

Editorial analysis: A gas skid can combine piping, isolation, regulation and monitoring, but this notice does not establish its equipment configuration. A complete skid-package price is not a valve-market quotation.

Relevant toProject owners, EPC contractors, equipment manufacturers and flow-control suppliers

03

What to watch next

Confirm the notice deadline and final award, then track gas service, pressure class, materials and control boundaries.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

CSSC Electronic Tendering Platform

气体撬块中标候选人公示

This is an independently written summary and analysis, not an official translation. Project plans and status may change.