Beijing university heat-pump system names preferred bidder at RMB17.16 million
The ground-source heat-pump system for China University of Petroleum (Beijing)'s dual-carbon research development has reached preferred-bidder publication, preceding a formal award.

The story explained
A notice published on Beijing’s public procurement platform on 22 October 2026 records evaluation on 21 October. The scope covers ground-source heat pumps and associated systems for the development’s laboratory and technology buildings. China Construction Third Engineering Bureau is the procuring party; the construction address is 15 Nanhuan East Road, Changping, Beijing.
Beijing Huaqing Ronghao New Energy Development ranked first with 95.01 points. Its recorded bid was RMB17,158,280.14 with a proposed duration of 657 calendar days. Shenzhen Zhongshenzhuang Construction Group and Maorong Group ranked second and third, scoring 91.46 and 90.66.
The notice runs from 22 to 26 October under tender FZZFA02600298. It provides rankings, bid prices and evaluation information, but no heat-pump capacity, circulation-pump parameters or valve schedule. The quoted amount covers the procurement scope and cannot be treated as valve-supply value.
Why it matters
Editorial analysis: Ground-source heating and cooling require coordination of plant, circulation pipework and controls. The preferred-bidder notice identifies potential implementation responsibility; final supply boundaries depend on contract and technical documents.
Relevant toProject owners, EPC contractors, equipment manufacturers and flow-control suppliers
What to watch next
Monitor objections, the formal award, equipment selection, commissioning and acceptance requirements.
These are research prompts, not announced tenders or confirmed subsequent developments.
Beijing Public Resources Trading Service Platform
中国石油大学(北京)“双碳”创新国际大厦(实验楼)项目(实验楼等3项)、中国石油大学(北京)“双碳”创新国际大厦(科技楼)项目(科技楼)地热源热泵及系统中标候选人公示
This is an independently written summary and analysis, not an official translation. Project plans and status may change.