ChemicalsProject watch

Jiangsu Shuangda leads Donghua circulation-pump shortlist

Curated by valve.market · China
Persistent browser storage is unavailable.
IN BRIEF

The notice covers black-water and lock-hopper circulation pumps; objections run to 15 November.

Added: 2026.11.12Source language: Chinese
Industrial piping illustration; not the pumps or project site in this procurement.
Industrial piping illustration; not the pumps or project site in this procurement. Image: Scott Webb / Unsplash
OrganizationsEast China Engineering Science and Technology
Location / scopeChina; project location not disclosed
Announced stagePreferred-supplier notice
01

The story explained

East China Engineering Science and Technology published preferred suppliers on 12 November 2026 for black-water and lock-hopper circulation pumps. Procurement reference 202616-PM5-D1-J457-I019, package /01, ranks Jiangsu Shuangda Pump Industry first and Beijing Aerospace Petrochemical Technology and Equipment Engineering second.

The public-notice period runs from 12 to 15 November. Bidders and other interested parties may submit written objections through the China National Chemical Engineering procurement platform during that period, with a response due within three days of receipt.

The notice identifies the pump categories and ranking but gives no quantities, flow rates, heads, materials, prices or delivery schedule. It also omits the project site. This is a post-evaluation shortlist, not evidence of a signed contract or delivered equipment.

02
EDITORIAL INTERPRETATION

Why it matters

Editorial analysis: Pump suitability depends on process-fluid and operating parameters; supplier ranking does not demonstrate product performance.

Relevant toProject owners, EPCs and flow-control suppliers

03

What to watch next

Watch for objections, the final award and the technical supply scope.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

中国化学电子招标投标交易平台

东华公司-黑水循环泵、锁斗循环泵成交候选人公示

This is an independently written summary and analysis, not an official translation. Project plans and status may change.