Catch-up: TCC names supplier for hydrogen test-site filters
The filter award for TCC's hydrogen test-site EPC project is dated 30 October in its body, although the platform list shows 31 October. This catch-up brief retains the document date.

The story explained
The filter award for TCC’s hydrogen test-site EPC project is dated 30 October in its body, although the platform list shows 31 October. This catch-up brief retains the document date.
Procurement TCC-T26061-MC-001-B, package /01, names Qidong Huali Petrochemical Machinery Equipment as the successful supplier following open negotiation.
The result gives no contract value, filter quantity, filtration rating, design pressure, material or delivery date. It confirms this package award, not delivery or commissioning of the entire hydrogen testing system.
Tianjin is the purchaser’s contact address, not a confirmed installation location. The service medium and interface with hydrogen processes require the supply specification before further conclusions can be drawn.
Why it matters
Editorial analysis: The award identifies a supply-chain milestone but does not establish high-pressure hydrogen service.
Relevant toValve, pump and process engineering teams
What to watch next
Track technical scope, delivery and acceptance information.
These are research prompts, not announced tenders or confirmed subsequent developments.
中国化学电子招标投标交易平台
天辰公司-天辰公司-氢能测试场EPC项目-过滤器成交公告
This is an independently written summary and analysis, not an official translation. Project plans and status may change.