Flow controlProject watch

Archive addition: Valmet details Rizhao pulp delivery booked in Q2

Curated by valve.market · China
Persistent browser storage is unavailable.
IN BRIEF

The 21 October disclosure concerns an order exceeding EUR 100 million already booked in Q2, not a new award today.

Added: 2026.10.22Source language: English
Illustrative industrial fluid equipment; not the Rizhao mill or Valmet's contracted equipment.
Illustrative industrial fluid equipment; not the Rizhao mill or Valmet's contracted equipment. Image: Crystal Kwok / Unsplash
OrganizationsValmet;世纪阳光纸业
Location / scopeRizhao, Shandong
Announced stageArchive addition: scope disclosure for an earlier booked order
01

The story explained

Valmet’s 21 October announcement details a Century Sunshine Rizhao pulp-mill order exceeding EUR 100 million, already booked in Q2 2026. This archive addition does not present it as a new award.

Delivery covers cooking and fibre lines, evaporation, recovery boiler optimisation, ash treatment and white liquor production. One fibre line switches between hardwood and softwood; another serves fluff and dissolving pulp.

The recovery scope includes recausticising and two lime kilns with biomass drying and gasification. Start-up is expected in June 2028. No separate valve contract or confirmed equipment subcontract list is disclosed.

02
EDITORIAL INTERPRETATION

Why it matters

Editorial analysis: Pulp, black liquor, white liquor and steam require separate evaluation of plugging, abrasion, corrosion and thermal cycling.

Relevant toProject owners, EPC contractors and flow-control suppliers

03

What to watch next

Watch implementation, material grades and supply boundaries; total contract value is not valve-order value.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

Valmet

Valmet’s key technology delivery supports efficient and flexible pulp production at the new Century Sunshine Rizhao mill in China

This is an independently written summary and analysis, not an official translation. Project plans and status may change.