WaterProject watch

Rushan tenders two wastewater-treatment upgrade lots

Curated by valve.market · China
Persistent browser storage is unavailable.
IN BRIEF

The tender covers biological treatment, sludge handling, magnetic flocculation, screening and dosing upgrades, with a planned 90-day duration.

Added: 2026.11.23Source language: Chinese
Wastewater-treatment industry illustration, not the Rushan facility.
Wastewater-treatment industry illustration, not the Rushan facility. Image: SELİM ARDA ERYILMAZ / Unsplash
OrganizationsRushan Water Group
Location / scopeRushan, Shandong
Announced stageOpen tender
01

The story explained

Rushan Water Group issued tender sg202617141 on 20 November for two upgrade lots at its urban wastewater plant. The self-funded works have a combined estimate of RMB45,007,492.50 and a planned duration of 90 days.

Lot 1 covers the oxidation ditch, sludge thickener and dewatering building, capped at RMB21,079,098.18. Lot 2 covers magnetic-flocculation sedimentation, screening equipment and the dosing room, capped at RMB23,928,394.32. Both lots form one upgrade event.

Document downloads close at 17:00 on 27 November; bids and opening are scheduled for 09:00 on 11 December, Beijing time. The scope includes construction and warranty obligations. These are tender estimates and ceilings, not an awarded contract or standalone valve prices.

02
EDITORIAL INTERPRETATION

Why it matters

Treatment and sludge upgrades directly involve transfer, dosing and process-control interfaces; pump and valve scope must be established from drawings and bills of quantities.

Relevant toValve, pump and process-control manufacturers; project engineers and procurement teams

03

What to watch next

Monitor clarifications, equipment schedules, procurement-date changes and the eventual award.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

Weihai Public Resources Trading Platform

乳山市城区污水处理厂升级改造项目(第一、二标段)招标公告

This is an independently written summary and analysis, not an official translation. Project plans and status may change.