WaterProject watch

Wanhua Penglai phase two tenders installation for two water stations

Curated by valve.market · China
Persistent browser storage is unavailable.
IN BRIEF

China Chemical Third Construction issued an October 28 notice for installation at the No. 7 circulating-water station and No. 2 water-supply station serving Wanhua Chemical's Penglai phase-two utilities. The two stations form one procurement package.

Added: 2026.10.29Source language: Chinese
Industrial machinery, an illustration rather than the Wanhua Penglai water stations.
Industrial machinery, an illustration rather than the Wanhua Penglai water stations. Image: Frantisek Duris / Unsplash
Organizations万华化学(蓬莱);中国化学三化建
Location / scopePenglai
Announced stageUtilities installation procurement
01

The story explained

China Chemical Third Construction issued an October 28 notice for installation at the No. 7 circulating-water station and No. 2 water-supply station serving Wanhua Chemical’s Penglai phase-two utilities. The two stations form one procurement package.

Package 20902067HXCGFA261020001/01 covers structural steel, piping, equipment, electrical systems, instrumentation and underground pipelines. Underground works include chambers and earthworks, giving the contractor interfaces across process equipment and supporting systems.

The scope extends through inspection, testing, commissioning, individual equipment trial runs, handover, startup support and warranty defect correction. The notice provides no station flow, pump or valve specifications, or budget; an installation scope does not independently identify equipment supply awards.

Documents close on October 31 at 17:00, questions on November 1 at 17:00 and responses on November 4 at 17:00, Beijing time. Consortium participation is excluded. No response security or CA certificate is required, and detailed qualifications are set by the negotiation documents.

02
EDITORIAL INTERPRETATION

Why it matters

Editorial analysis: Installation, instrument integration and startup support require coordinated interfaces. Separate equipment-supply arrangements remain to be confirmed.

Relevant toIndustrial-water, pump, valve and installation companies

03

What to watch next

Watch supply boundaries, integrated commissioning conditions, clarifications and the award notice.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

中国化学电子招标投标交易平台

三化建-万华化学(蓬莱)有限公司二期公辅设施项目7#循环水站、2#供水站安装工程(江苏分公司)-竞争性谈判项目公告

This is an independently written summary and analysis, not an official translation. Project plans and status may change.