IN BRIEF

Guoneng Diannan Kaiyuan Power has opened procurement of flue-gas and air-duct dampers, including design, manufacturing, inspection and site support, for its phase-four expansion.

Event: 22 Oct 2026Added: 2026.10.23Source language: Chinese
Illustrative industrial ductwork; not the Xiaolongtan site or equipment offered under this tender.
Illustrative industrial ductwork; not the Xiaolongtan site or equipment offered under this tender. Image: Compagnons / Unsplash
Organizations国能滇南开远发电有限公司
Location / scopeKaiyuan, Yunnan
Announced stageEquipment tender
01

The story explained

An announcement published on 22 October 2026 by China Energy’s tender platform identifies procurement CEZB260508905 at Xiaolongtan in Kaiyuan, Yunnan. The expansion comprises one 700 MW ultra-supercritical, single-reheat, wet-cooled coal-fired unit on land formerly occupied by demolished phase-one and phase-two units. It will also provide supplementary and backup industrial steam for the local chemical-industry park.

The single procurement package covers duct dampers and associated equipment, together with design, manufacture, inspection, installation guidance, testing support and site technical services. Delivery to the construction site is provisionally required by 20 December 2026, subject to the buyer’s final notice. Detailed technical scope is referenced to chapter five of the tender documents.

Documents are available from 09:00 on 22 October until 16:00 on 27 October; electronic bids close at 09:00 on 11 November, all Beijing time. Bidders need at least two domestic supply references, contracted since November 2021, for duct dampers on thermal generating units rated at least 600 MW. Joint ventures and agents are excluded.

02
EDITORIAL INTERPRETATION

Why it matters

Editorial analysis: This is a defined damper procurement. Suppliers should assess duct conditions, interfaces and installation-support obligations; generating capacity does not establish valve-order value.

Relevant toProject owners, EPC contractors, equipment manufacturers and flow-control suppliers

03

What to watch next

Watch clarifications, damper dimensions and sealing requirements, actuator and control interfaces, and the eventual award and delivery notice.

These are research prompts, not announced tenders or confirmed subsequent developments.

SOURCE & VERIFICATION

国能e招 / 国家能源集团

云南公司开远小龙潭发电厂四期扩建工程机组烟风道风门及附属设施设备采购公开招标项目招标公告

This is an independently written summary and analysis, not an official translation. Project plans and status may change.